Construction works are actively underway in Arsenal Residence

Construction works are actively underway in Arsenal Residence

In block A:

  • Block arrangement works have been completed both inside and outside the building;
  • The filling of the facade with blocks and the removal of internal partitions in the apartments have been completed;
  • The facade of the building is being covered with bricks;
  • Balcony railings are being installed;
  • Sewage, ventilation, water, and heating arrangements are completed;
  • The floor arrangement is being installed on the 3rd floor. "VIBRAFLOOR" insulation is used on the floor, with a polyester layer, which is the bottom layer of the stretched floor and surrounds the tile;
  • The roof was covered with insulation material;
  • The facade is being covered with Ortesian beams;
  • Installation works of aluminum doors and windows and electrical wiring of apartments are underway.

 

In block B:

  • Roofing of the last slab is in progress;
  • 90% of monolithic works are completed;
  • Including the third floor, the block arrangement works, both inside and outside the building, have been completed.

 

The construction of block C has started. Foundation works of block C are in progress.