New Year’s Discounts at Arsenal Residence! Save up to 15,000 GEL!
New Year’s Discounts at Arsenal Residence! Save up to 15,000 GEL!

Take advantage of our exclusive New Year’s offer and purchase a 1-bedroom apartment in Block C at the best price! Hurry, this limited-time offer is valid only until December 31! Don’t miss out!

The construction of Arsenal Residence is actively underway
The construction of Arsenal Residence is actively underway

Block A: Facade filling with blocks and removing internal apartment partitions have been completed; Brick cladding of the old facade is in progress; Facade insulation and wood cladding work are ongoing; Balcony railings are being installed; Raised floor installation to the 5th floor is complete; "VIBRAFLOOR" insulation has been applied with a polyester layer that adheres to the tile as the lower layer of the raised floor; Facade cladding with orthotic coils is underway; Aluminum door and window installation up to the 2nd floor has been completed; Electrical wiring in apartments up to and including the 4th floor is finished; Elevator installation has begun. Block B: Monolithic framework has been completed; Blockwork arrangement, both inside and outside the building, up to and including the 4th floor, is finished. Block C: Reinforced concrete work for the foundation has been completed.

Arsenal Residence Black Friday Promotions Are Here!
Arsenal Residence Black Friday Promotions Are Here!

In celebration of Black Friday, Arsenal Residence is offering exclusive deals for our customers. Save up to 40,000 GEL on a 1, 2, or 3-bedroom apartment in our exclusive development. Hurry—only 7 apartments are available at this special price! This promotion is valid until November 30th, so don't miss out!

Sales of Block C in "Arsenal Residence" have started
Sales of Block C in "Arsenal Residence" have started

"Arsenal Residence" - one of outstanding multifunctional districts of Tbilisi is actively developing on Arsenal Mountain. The company appeared on the market in 2023 and today it is the most demanded residential project in Avlabari. The area includes: 4 low-rise residential blocks, 170 m. long boulevard, interior green areas, office and commercial spaces, pool and fitness room, restaurant and lounge, as well as up to 500 underground parking spaces for residents and guests of the area. "Authentic architecture of the project, characteristic of old Tbilisi, unique location, high-quality construction standards, unique views of Mtatsminda, Narikala and old Tbilisi are only a small part of the project's advantages, which lead to high interest of people. Accordingly, up to 80% of apartments in blocks A and B have already been sold. The residents of these blocks will be able to start the repair works in 6 months," said the director of the company, Levan Karumidze. Sales of the third - C block, whose construction is actively underway, began in October. From block C, there are amazing views of the Trinity and the whole city. "Quite a lot of customers were waiting for the launch of block C, which led to corresponding sales at the very first stage of the block's sales launch. Anyone can easily look at free apartments on the company's website -WWW.AR.GE" - said Nino Absandze, head of the commercial direction of the project. The MBG company is carrying out the construction works of "Arsenal Residence", and the commercial direction of the project is being managed by the company- WWW.GREA.GE

Construction works are actively underway in Arsenal Residence
Construction works are actively underway in Arsenal Residence

In block A: Block arrangement works have been completed both inside and outside the building; The filling of the facade with blocks and the removal of internal partitions in the apartments have been completed; The facade of the building is being covered with bricks; Balcony railings are being installed; Sewage, ventilation, water, and heating arrangements are completed; The floor arrangement is being installed on the 3rd floor. "VIBRAFLOOR" insulation is used on the floor, with a polyester layer, which is the bottom layer of the stretched floor and surrounds the tile; The roof was covered with insulation material; The facade is being covered with Ortesian beams; Installation works of aluminum doors and windows and electrical wiring of apartments are underway. In block B: Roofing of the last slab is in progress; 90% of monolithic works are completed; Including the third floor, the block arrangement works, both inside and outside the building, have been completed. The construction of block C has started. Foundation works of block C are in progress.

Arsenal Residence: A New Multifunctional District in Avlabari
Arsenal Residence: A New Multifunctional District in Avlabari

Arsenal Residence multifunctional area is located 650 meters from the Trinity Cathedral and offers office, commercial, recreational and entertainment spaces along with residential. The new multifunctional complex consists of a total of 4 blocks, the construction of blocks A and B of which is actively underway, and 70% of the apartments have already been sold. The project includes 500 underground parking spaces.