A Block:
- Roofing works of the last floor have been completed
- The vertical construction of the terrace and duplex apartments on the last floor is being reinforced, molds are being made and concreting is in progress
- Block arrangement works including the 3rd floor have been completed both inside and outside the building
- 98% of the monolithic frame is completed
- From the 4th floor to the 6th floor, the facade is being filled with blocks and internal partitions in the apartments are being built.
- The old facade of the building is being covered with bricks
B Block:
- The pouring of the foundation and the roofing of both floors of the parking area have been completed.
- The vertical construction of the commercial floor is being reinforced, molds are being made and concreting is in progress.
Construction works are carried out by the company MBG